| Extended and Reinforced Column sitting on new Grade Beam with temporary Truss removed |
|
| 13. Start removing the existing grade beam and the top portion of the existing pier (the vertical bars in the existing pier need to be preserved so that they can be cast into new grade beam). 14. Extend the existing column with W24X250 as indicated (full penetration weld needs to be x-rayed to verify the quality of the connection). 15. Pour new grade beam. 16. Add non-shrink grout beneath the base plate of the extended column. 17. Start removing the temporary framing after the concrete of the new foundation reaches its designed strength. 18. Remove the wing tags of the reinforcing/ connecting plate.
Project: Dave & Buster's Location: Stonebriar Mall, Frisco, Texas Architect: Melvin R. Fain, Architects Structural Engineer: TSAO Consultants Contractor: Shawmut Construction
|